Contact Us
+1-877-FAUSKE1
STORE
Log In
My Cart
Testing
Nuclear Testing
Chemical & Industrial Testing
Combustible Dust Hazards Testing
Dust Hazards Analysis – Canada
Gas & Vapor Flammability Testing
Engineering & Consulting
Chemical & Industrial
Chemical Reaction Hazards
DIERs Emergency Relief System
Combustible Dust Hazards Analysis (DHA)
Failure Analysis
On-Site Process Safety and Risk Management
Reaction Calorimetry
Thermal Stability
UN-DOT Testing
Maintenance Optimization Modeling
Adiabatic Calorimetry
Nuclear
Acoustic Analysis - Flow Induced Vibration
Capabilities
Cable Health Aging
Cable Testing
Chemical and Radioactive Waste Safety
Commercial Grade Dedication / Reverse Engineering and Obsolescence
Custom Engineering & Testing
Debris Intrusion
Electromagnetic Radiation (EMC)
Equipment Qualification (EQ) Testing
Fire Modeling & Cable Selection/Circuit Analysis
Fukushima - Related Engineering
Gas / Air Intrusion Accumulation
MAAP
Plant Analysis
Probabalistic Risk Assessment (PRA)
RELAP Transient Analysis
Reactor Auxiliary Building Analysis
Severe Accident Management
Spent Fuel Processing Engineering
Structural Engineering
Thermal Hydraulics
Verification and Validation
Waste Management & D&D Process Engineering
Waterhammer
Combustible Dust Hazards Analysis
Dust Hazards Analysis – Canada
Mechanical & Electrical
Fire Protection
Training
Products
Industries
About Us
Resources
Resources
Blog
Process Safety News
The Fauske Team
10.30.20
MIE Testing for Combustible Dust Safety: With or Without Inductance?
By the Combustible Dust Safety Team, Fauske & Associates, LLC We know we have discussed the Minimum Ignition Energy...
READ MORE
The Fauske Team
10.30.20
MIE Testing for Combustible Dust Safety: With or Without Inductance?
The Fauske Team
07.01.20
Process Safety News - Spring 2020
Marc Cramer
02.13.20
Process Safety News - Winter 2020
nuclear
chemical
Combustible dust
testing
news
Recent Posts
process safety Engineering Safety Articles
Dec 04
Are Your On-Site Safety (OSS) Services Up to Snuff?
Do you work with an objective, outside process safety engineering firm offering a complete range of.
Nov 19
Beyond Zero Injuries and The Sticky Note
In a recent issue of Safety & Health Magazine from the National Safety Council, author and speaker.
Nov 06
Safer Scale-Up of Batch and Semi-Batch Reactions Part 3: Applications of Adiabatic Calorimetry
Richard Kwasny, Ph.D., Senior Consulting Engineer and Gabe Wood, Manager Thermal Hazards Testing &.
Oct 22
Process Safety News Fall 2019
Enjoy our new format with articles: INTRODUCING! Fauske Emergency Relief System Tool (FERST).
Jul 31
Safer Scale-Up of Batch and Semi-Batch Reactions; Part 2 - Quantification of the Desired Reaction
Donald J. Knoechel, Ph.D., Senior Consulting Engineer, Fauske & Associates, LLC This is the second.
Jul 29
Process Safety News Summer 2019 Edition
Enjoy our new format with articles: Safer Scale-Up of Batch and Semi-Batch Reactions; Part 2 -.
Jun 11
VSP2 – Everything You Need to Know About Setting Up Your Heater Assembly
By Elizabeth Raines, Chemical Engineer, Fauske & Associates, LLC Introduction Ensuring that the.
Jun 07
Relief Systems Design Course - Vent Sizing, Two-Phase Flow
As a principal investigator with the DIERS research project and founder of Fauske & Associates,.
May 30
Process Safety Strategy – Chemical Reaction Hazard
By Himanshu Chichra, Principal Process Safety Engineer and host of ‘Process Safety and Risk.
1
2
3
4
5
Is My Dust Combustible?
A Flowchart To Help You Decide